The windows are installed with insulated glazing and a slight tint to reduce solar heat gain.
20
Walkways and drainage is installed in the garden courtyard so that landscaping can begin.
21
Bracing is installed on the wood pavilions in preparation for the installation of the glass curtain wall.
22
With the roof complete and windows installed, drywall is installed throughout the facility.
23
On the exterior, the concrete driveway has been poured.  Lighting and landscaping is proceeding.
24
After the drywall has been taped and the walls primed, ceiling grid is installed, along with the lighting.
25
In the boarding exercise area, the landscaper is preparing the planter.
26
Water resistant gypsum board is installed in the boarding area.
27
Curtain wall windows are being installed on the entry paviliions.  The new building being completed with the old clinic in front.