A gallery of photos showing the progression of construction for the New Wheeling Animal Hospital and Pet Resort

10
As the masonry is being completed, the installation of the structural steel components begins.
11
A crane is brought onto the site to erect the interior steel columns and roof framing.
12
The steel roof structure is tied into the masonry walls.
13
Trench drains are carefully set in the boarding area.
14
Instead of having a retaining pond on the site, several large drainage pipes are used to contain storm water below the parking lots.
15
The wood entry pavilions are erected with energy efficient roof panels.
16
The wood pavilion framing is tied into the steel roof framing below.
17
Work on the interior, such as plumbing, electrical and ventilation moves rapidly ahead.
18
Wall framing proceeds, along with electrical work.